Friday, August 31, 2007

Construction update #17

What a week.

We hoped to pour this Friday. Then we hoped for Tuesday after labor day. Now we are thinking Wednesday. Nothing ever happens that speeds a job up. I guess the goal is to minimize the things that happen to slow the job down.

More fires. But not real fires this time. Just concerns, conflicts, etc between low voltage guy, ICF man, electrician and engineer. Turns out that running conduit in the concrete space between foam walls can significantly affect engineering. A couple of do-overs and we are back on track.

I backed out on the loader. Too old, too slow, too loose in the joints (the loader, not me). So, maybe something else will come along.

Meanwhile, we can hope to pour the walls next week. Wednesday.

Might actually go smooth, I am going to be away at trial!

Steve