The whole of last week was spent shoring and bracing. Fixing and redoing. But still progressing.
Passed the electrical inspection on Thursday. Funny that the state needs to inspect empty conduit. Seems to me that it is not really electrical until wires are run through it.
Concrete arrived for the walls on Friday. The boom truck was delayed, so we had the trucks stacked in a holding pattern. 55 yards later the walls were solid.
Eric and Matt stayed over so we could strip the bracing on Saturday. All is ready for the waterproofing, dimple boards and back filling.
Steve
Sunday, September 9, 2007
Construction Update #18