Perfect weather for a slab pour. Cool, slightly overcast, and calm.
And no pump truck. Mechanical failure. So the guys stood around. The dog snoozed.
Finally we got things going. And kept things going thru 44 yards of mud. The earth tone colors are for the master suite. The pinkish colors are for our own little princess, Katie. In between are the boys bedrooms.
The power trowel over blends the colors, so the entire floor was hand troweled. I bought the guys some beer, but left before they finished . . . The floor.
The USFS showed up to mark the 40’ easement. The house plan encroaches the easement. Then again, the driveway runs to the outside of the easement anyhow. And who needs a 40’ wide easement to get to a trail that is only 10’ wide. Its a struggle, but maybe, just maybe, common sense will prevail. Otherwise the two car garage might become a two moped garage!
I am sooooo glad the floor finally got poured.
Steve
Wednesday, October 24, 2007
Construction Update #31