Finished backfilling the new slab. Just in time for the plumber to dig it up for sewer lines. But, this time we were smarter. Instead of 5/8minus, I used sand for the fill. Much easier to dig in.
Eric and crew added another two layers to the floor puzzle. Wire mesh and stirrups. I wonder if the concrete deck of an aircraft carrier is any more solid.
The four flights of stair arrived from Florida. I told the driver to turn left after Safeway. 40 minutes later he called and asked which side of the rest area was I on? (the rest area is 15 miles past Safeway). It is easy to see the stairs are from beach sand; there are bits of shell in the rough areas.
Electrician was sick, so no progress on that front. Hopefully several pours will occur next week. Weather soon becomes an issue.