Tuesday, September 11, 2007

Construction Update #19

Waterproofing is a big deal, although I am thinking we are overdoing it. The spray on goop costs $2,000. Then the drain board. Then more gravel, etc.

For a house made of concrete and styrofoam, we sure are using a lot of wood. Something about having to support the wet concrete as it dries. Hmmmm. O well, lots of scrap wood at the end for the kid to build jumps and club houses with.

The floor system is taking shape. Need to solve the question about overhanging the riparian set back. Tomorrow we start filling above the gravel.

Steve

1 comment: