Almost like making a cake. Layer after layer. Step after step.
The white is the R-10 insulating foam. First we compact the soil to concrete stiffness, then we put squishy foam on top. Go figure.
The groove in the foam is for a thickened slab under the home theatre wall. The home theatre will be concrete all four walls. Quiet so it can be loud.
I am doing the hydronic work myself. Today I got 400 lineal feet done. ‘Course I got 800 feet still to do. And that is just on the basement level. Hard to think about floor heat when it is 100+ outside.
Yes, if you are in Leavenworth you can stop by and tour the job site. From town, follow Icicle Road to Mile Marker 4, then look for 7205 . the driveway is on the left.
Overnight visitors are most welcome at Adventure Inn (509) 548-5250
As we near the end of construction, it is time to sell the riverfront house we have lived in the past several years. Nearer to town, it is a nice four bedroom, three bath rambler with about 170 feet of Wenatchee riverfront. Call or email us for pictures and more information. 509.860.1446
No comments:
Post a Comment