Tuesday, July 24, 2007

Construction Update #10


Day 9 brought Eric back for a mini pour. Just 6 more yards to complete the perimeter and base of elevator shaft. I gave up trying to backfill on my own. My regular excavator said he could schedule me in, maybe, in two weeks. My new regular excavator, Rayfield scoped the job that day and got right on it.

Day 10 it was nice to see a dump truck make it to the front of the foundation. And not into the river! About 30 yards of drain rock topped with 5/8 minus, whatever that is. Then compacted in 100 degree heat. No sweat.

Tomorrow the plumber. Then the electrician. Then me on the radiant floor. Then. Then then.

Steve

No comments: