Construction Update #54

The steel railing guys brought welding equipment to add to the 100+ degree temps. They want vertical spindles, while I want horizontal cables. He calls it a ‘ladder’ for the kids. He also refers to the ATV to the outhouse as the shitter shuttle. My hope is his welds as as smooth as his vocabulary!

I just don’t get the younger generation with pants at half mast. If I forget my belt, I am constantly pulling up. At least I am not in the belt and suspenders group. Are you?

Met with the power guy. Voltage drop is an issue. There was a $5,000 fix, and then, with some conversation, we came up with a free fix. Feel the power.

The USFS came through with an agreed reprieve of the four trees on the inside corner. I paid the $1,310 and the Ranger assured me the money would remain dedicated to my roadway so as to be available if ever needed. Yeah, right. At least that’s done.

Seeing the walls go up gives real definition to the building. Course, now I am stressing about bracing, etc.

Steve


Monday, July 7, 2008

Construction Update #54

With respect to the Great Communicator (Mr. Gorbachev, tear these walls down), I was glad to finally say, Mr. Strode, build those walls up! These are the first walls since resuming work four months ago. Whew!

We tore away the shoring under the top deck. The cantilevered concrete deck with massive front beam is visually intimidating. And very cool.

Debbie went front door shopping. Seems everybody makes the same generic styles. We are looking for something unique, but complimentary to the theme of the house. Hmmmm.

The three day weekend took its toll. Terry no-showed. The floor grinder guys late showed, and then fiddled with the electrics until very late in the day. Eric was expected but did not appear. I guess the 4th burnt out more then just the fireworks.

Progress nonetheless.