Zachary Miller spends a whole day fine tuning the two pillar rocks to support the mantle rock. Glad I am not paying ‘by the rock’!
Although the pictures are all of the fireplace, Jarred is busy framing in the nooks and crannies, Travis continues to line and level the walls in advance of the sheet rockers. Terry, when not in court, drills for cable runs. Joe helps me with cables grumbling out loud what the hell is the point of it all. Strode is finishing the central vac install. And the sheetrockers are ahead of schedule. Lee is nearly done with the inside Eldorado stone work.
And me, well I just write the checks and take credit when things go well.